Repairs to “Hipnautical” — A Grampian 26 (Day 4)

REPAIRS TO "HIPNAUTICAL" - A GRAMPIAN 26


March 17 2010 Hipnautical Repair

St Paddy’s Day brought us to the skin refit. We installed a 10”x40” 1/8 pegboard lengthwise with another 5x36 over the top to give the final amount of raised support for the skin. Chris had chiselled the skin and it fit, so we mixed up the remainder of the resin, one full gallon went in total for this project.

Repairs to “Hipnautical” — A Grampian 26 (Day 4) photo

We nailed the skin down where we felt it needed some support.

Repairs to “Hipnautical” — A Grampian 26 (Day 4) photo

Repairs to “Hipnautical” — A Grampian 26 (Day 4) photo

Looks a lot smoother and even, much improved so far!

Now to let it cure for 24 hours and then put a final bit of resin if needed.

And as a bonus I put my racing # on the mainsail today! Almost time to get her in the water!

Repairs to “Hipnautical” — A Grampian 26 (Day 4) photo

Repairs to “Hipnautical” — A Grampian 26 (Day 4) photo

Repairs to “Hipnautical” — A Grampian 26 (Day 4) photo

Lily is not being a good boat dog in this picture.

Repairs to “Hipnautical” — A Grampian 26 (Day 4) photo

It is a Discovery 79, but this is what the sailmaker gave me!

Repairs to “Hipnautical” — A Grampian 26 (Day 4) photo

Another 2 weeks and the shed is free of sail gear.

Brad J Boudreau
Hipnautical
Grampian Discovery 79 hull #38

PREVIOUS DAY